Over the past few week I have been working on the bus.
Here is an update of what has been done.
I have finished all the paneling in the bathroom.
This is where the shower control is:
This is in front of the bathroom door opening:
I was able to make the plastic paneling contour to the wood underneath. I will be installing a piece of trim along the top of this paneling where the paneling and the ceiling meet.
Here is the seam along the ceiling.
Here it is with it caulked and the light installed.
Here is a view with the light switch installed.
Behind where the drivers seat goes I still had to install a piece of plywood paneling.
Here it is before:
And after:
Here is a pic of the kitchen illuminated: