Today we decided to go ahead and install the stone tile in the bathroom.
Here is a pic of the floor after the Hardy Backer was installed:
Next was the task of cutting a hole for the 3" toilet drain pipe. I did not have a hole saw big enough so I drilled holes in a circular pattern and then used a sawzall to cut it out.
Next was laying the tile. I am usually prepared but I could not find my tile trowel so I made one out of sheet metal.
Here is all the tile laid:
More Soon!
2 comments:
You have been doing a jam up job on the bus. I have been following you since the beginning and have been very impressed. Wanted to finally give you a shout out. Keep up the good work.
Thanks! We appreciate the comment.
Post a Comment